Products

How winter maintenance dredging

How winter maintenance dredging

A winter maintenance dredging ship 1, before starting the first of the entire mechanical drive system and machine oil checked, and then start the pull back conveying diesel engine, with the pull clutc

Description

A winter maintenance dredging ship

 

1, before starting the first of the entire mechanical drive system and machine oil checked, and then start the pull back conveying diesel engine, with the pull clutch, start engine, slowly moving loose clutch, the speed adjusted properly. Then launch diesel bucket front zipper.

 

2, two after starting the diesel engine speed to will. The need for speed. Then release the brake arm. Slowly it down, other than the sand hopper 2/3, to stop decentralization, until 1/3 and funded under the arm. When the big arm and the water into a 45 degree angle, should be parked arm. Then how much sand in the hopper switch traction control.

 

3, The dredging forward to check How much sand in the bucket and fixed, forward and backward to be flexible in case of mechanical sand cave strenuous work or pull to loosen the rope, the ship backward until it stops digging. In case of large stones under water or mud, the ship will be severe vibration phenomenon, then immediately filed dredging arm, then avoid obstacles.

 

Two, the dredging bucket maintenance method

 

1, every 100h maintenance project. The boom cylinder head pin; boom foot pin; boom cylinder rod end; the bucket rod cylinder head pin; arm bucket rod, a connecting pin; the bucket rod bucket cylinder rod end; cylinder head pin; half rod connecting pin; the bucket rod bucket cylinder rod end; bucket cylinder head pin; the bucket rod connecting pin; oil level check box rotating mechanism (with oil); water and sediment discharge from the fuel tank.

 

2, every 250h maintenance project. The final drive oil level check box (add gear oil); check the battery electrolyte; replace the engine oil pan oil filter replacement engine; lubricating rotary bearing (2); check fan belt tension, and check the air conditioning compressor belt tensioning degree, and make adjustments.

 

3, every 500h maintenance project. At the same time every 100 250H and maintenance projects; fuel filter replacement; check rotary pinion grease height (grease); check and clean the radiator fin oil cooler, heat sink and chiller heat sink; replacement of hydraulic oil filter; change the oil in the final drive (only for the first time at 500h, after 1000h times); air filter cleaning device of air conditioning system of internal and external; replacement of hydraulic oil vent filter.

 

4, long-term storage. The machine being stored for a long time, in order to prevent the hydraulic cylinder piston rod rust, the work should be placed in a device; the washed and dried and kept in dry indoor environment; if conditions are only stored outdoors, the machine should be parked in the well drained water mud on the ground; storage before the full fuel tank, lubricating parts, replacement of hydraulic oil and lubricating oil, the metal surface of the piston rod of the hydraulic cylinder exposed coated with a thin layer of butter, remove the battery negative terminals of the battery, or will be unloaded separately; according to the lowest environmental temperature in antifreeze adding cooling water; and a month to start the engine the operation of the machine, In order to lubricate the moving parts and charge the battery at the same time, turn on the air conditioner to cool and run 5-10min.

 

Three, the daily maintenance of the pump

 

1, bearing water pressure, water quantity to meet the requirements, at any time to adjust (or replace) the degree of tightness of the filler, do not cause shaft seal leakage, and promptly replace the shaft IH pump shaft pump casing

 

2, the replacement of bearings, we must ensure that the bearing assembly dust-free, clean lubricants, pumps running temperature generally less than 60- 650C bearing is appropriate, the highest not more than 750C.

 

3, to ensure that the motor and pump coaxial, to ensure that the elastic pad in the coupling complete and correct, damaged should be replaced in a timely manner.

 

4, ensure that the pump components and piping system are installed properly and firmly.

 

5, parts of slurry pump are wearing parts, in daily use should pay attention to the loss of vulnerable parts, timely repair or replacement of the slurry pump. The vulnerability of the maintenance or replacement process to ensure the correct and reasonable gap adjustment, avoid tight Shibuya friction appearing.

 

6, the suction pipe system of slurry pump must be no leakage state, at the same time in the operation should pay attention to whether there is clogging. Suction entrance pump required to deal with the medium containing solid particles, so the grille into the pump pool placed should be consistent with the slurry pump can through the particle requirements into the pump body can cause reduction of the plug roots pump less than water ring vacuum pump of large particles or long fiber material.

image

          [click to see more about the product ](/products/)



Shuangfeng Qirun Machinery Parts IMP&EXP Co.,Ltd, specializing in the production of domestic and foreign brands of crusher wear spare parts manufacturers, production of domestic brands, Hua Yang, Shan Bao, SBM brands such as crusher wear parts, spare parts, as well as foreign brands, common, Sandvik, TEREX and other import brands crusher spare parts, wear parts, mining quarry companies such as crusher wear parts of choice. We achieve cost-effective localization of imported spare parts, service users at home and abroad. The company can be matched with various brands of hydraulic crusher electric parts, sealing parts, standard parts and other accessories, can meet the needs of one-stop shopping for customers at home and abroad the demand.

      

Shuangfeng Qirun Machinery Parts IMP&EXP Co.,Ltd has thirty years of production experience, and years of experience in processing export products, products have been exported to the United States, Canada, Australia, Sweden, Finland, Russia, Ukraine and Southeast Asia and other countries and regions. Shuangfeng Qirun Machinery Parts IMP&EXP Co.,Ltd product using the original material, high-quality raw materials, casting and heat treatment process we have a unique thirty years production experience, to ensure complete interchangeability, and original spare parts with high quality and competitive price, provide quality products, quality services for the majority of users.

 

Shuangfeng Qirun Machinery Parts IMP&EXP Co.,Ltd wearable parts can be customized to map, and if there is no map, the company has professional mapping personnel to help you mapping, after customization

 

Contact:Sales Director: Eileen Cai ;

      Email: sales@qrmech.com;

      Mobile telephone: +8618973821771

From Inquiry to Delivery - How It Works

Trusted by customers in 30+ countries. Standard lead time 15-30 days.

1
Send Inquiry
Email + equipment model
2
Get Quote
Within 24 hours
3
Production
15-30 days (MTR included)
4
Delivery
Sea/Air shipping
30+
Countries Exported
20+
Years Experience
ISO 9001
Valid to Jun 2028
MTR
Included per Shipment

Frequently Asked Questions

What materials are available for this crusher wear part?

High manganese steel Mn13, Mn13Cr2, Mn18Cr2 and Mn22Cr2, plus high chrome iron (Cr26) for fine crushing. We select the material based on your abrasive and impact conditions - send your working conditions for a recommendation.

Which crusher brands and models are compatible?

Aftermarket parts fit Metso (HP, GP, C, NP series), Sandvik (CH, CS, H, S series), Symons 2FT-7FT, Terex Pegson, Kleemann, McCloskey, Shanbao, SBM, Telsmith, Minyu, Hazemag and more. Any model can be custom made by drawing or sample.

Can you manufacture custom parts from drawings or samples?

Yes. Send a drawing (PDF, DWG or CAD) or a used sample. We measure, draft and confirm all dimensions with you before production. OEM part numbers are welcome for reference.

What is the lead time and minimum order quantity?

Standard lead time is 15-30 days and samples ship in 7-15 days. MOQ is flexible - trial orders from 1 piece are accepted.

What quality certificates and documents are provided?

ISO 9001 certified factory (Kaixin Certification, CNAS-accredited; certificate valid through June 2028). Every shipment includes a Material Test Report (MTR) with chemical composition and mechanical properties.

How are the parts packaged and shipped?

Export-standard wooden crates with rust protection. Sea and air freight from Shanghai and Ningbo ports to worldwide destinations.

Crusher Wear Part Material Guide

MaterialInitial HardnessBest For
Mn13 (ASTM A128)HB 200-230General crushing with medium impact
Mn13Cr2HB 210-240Standard jaw plates and cone liners
Mn18Cr2HB 220-250High-impact, abrasive feed
Mn22Cr2HB 230-260Severe impact, hard and large rock
High Chrome Cr26HRC 58-62Blow bars, fine crushing of abrasive material

* High manganese steel work-hardens under impact to 500+ HB at the wearing surface, giving long life in hard-rock crushing.

Product Inquiry

Interested in this product? Fill out the form below and we'll respond within 24 hours.